Frazier Park Public Utility District New Well #8 and Pipeline Replacement Project
Project Status: Grant Application in Progress
Phase 1: The replacement of approximately 18,300 feet of District potable water distribution pipelines in three of the District's service areas, Summit Area, Lower Summit Area, and Texas Trail.
Phase 2: A new potable water well, proposed District Well #8.
FP-081 Initial Study (Well 8).pdfFP-081 NOA.pdfAppendix 1 Plans.pdfAppendix 2 Pipeline Replacement Engineer_s Report.pdfAppendix 3 17090-03 AQ & GHG Assessment.pdfAppendix 4 DRAFT 2026 FPPUD Well 8 and Pipeline BRA-ARD Report.pdfAppendix 5 4397 Report.pdfAppendix 6 GeoTracker and EnviroStor.pdfAppendix 7 Binder2.pdfAppendix 8 FEMA 06029C3854E.pdf
FP-081 NOC copy.pdfFP-081 Notice of Intent.pdfFP-081 Draft Mitigated Negative Declaration.pdf